The content on this page is intended for informational purposes and while all effort has been made to present current summary facts, the reader should contact the appropriate entity for details and up-to-date information. In no circumstance should you use the information on this page here as a substitute for the appropriate advice.

The Clark County Title 40 Code contains much of the information in this fact sheet.

Small acreage landowners often find it difficult to navigate the maze of Clark County and state codes pertaining to land use. Many elements of these codes are required by state and/or federal laws. These codes attempt to balance your rights with your neighbor’s rights, while promoting a clean and healthy environment that maintains livable communities for all Clark County residents. County ordinance states that county codes “safeguard public health, safety, and general welfare of the citizens of  Clark County.”


I’d like to build a barn. Do I need a permit?

No permit is necessary if the structure you plan to build is 100% for agricultural use. This means that you cannot use the building to park your RV, but you can use it to park a tractor and store agricultural implements. Of course, housing livestock and/or related supplies (feed, hay, etc.) is fine, too. However, this building could not be used for processing or packaging agricultural products (no cooking up your favorite salsa recipe) or be open to the public (e.g., farm produce stand). Additionally, no one may live in the structure. Even when a permit is not required, you will still need to follow the current Washington Building Code and meet setback requirements. Additional information on ag buildings can been seen at Clark County Agricultural Structure Permit Exemption. 

If you plan to plumb water, heat or wire the place for electricity, you will still need a permit even if you do the work yourself.

What Projects need a building permit?

Other than the agricultural building above, most construction projects require permits. Any work on a building’s structural components, plumbing, and mechanical work requires a permit regardless of the dollar value of the work. This includes reroofing, re-siding, retaining walls over four feet high, fences over six feet high, or building a deck.
For information on construction work, contact the Permit Center at 1300 Franklin Street, Vancouver, WA or call 564-397-2375.
Electrical work can be done either by an electrical contractor or the homeowner. Permits must first be acquired from the Department of Labor and Industries 360-896-2300, located at 312 SE Stonemill Drive Suite 120, Vancouver, 98684-3508. Completed electrical work must be inspected by an L&I licensed inspector. To determine the fee for the permit, visit the Washington Dept of Labor and Industries fee page.

I want to build a tool shed, but someone told me I need a permit to build it. Is that true?

Codes require a permit for garden sheds over 200 twenty square feet in area or eighteen feet or more in height.  Even when your project does not require a permit, these buildings must conform to the current county code, meet setback requirements, be separated by eight feet from any other building on the property, and meet environmental requirements.

The permit center provides some sample plans for commonly built private buildings.  You can also talk to a plans examiner at the permit center who will answer your specific questions.  In some cases, you may need to hire a professional engineer to ensure that your building project complies with the current standards.

For information on requirements, contact the Permit Center (1300 Franklin Street, Vancouver, WA) at 564-397-2375. You will need to leave a message for a permit technician who will return your call by the next business day.

What are the setback requirements?

Setback requirements vary by how your property is zoned and what type of structure you are building. Based on information found on the Clark County Community Development Building FAQ’s page or the previous table summarizes setback requirements for most rural zoning classifications.
You can also find information about setback requirements on your land using Clark County Maps Online.

Do I need a permit to clear vegetation from my property? What about next to my creek?

In most cases, mowing, cutting, and legal herbicides can be used to maintain your property and keep brush and other vegetation in check.

If you plan to use heavy equipment to clear brush or if you plan to clear brush within 200 feet of your creek or wetland, a Habitat Permit review may be required, except when clearing nuisance vegetation like blackberry, Scotch Broom, and Tansy Ragwort. Clearing these are exempt from the Habitat Permit review if you use hand tools and do not disturb the soil or other vegetation. Disturbing soils near streams can lead to erosion that harms aquatic life in the stream.

Before you start clearing in these areas, call Clark County Environmental Services at 564-397-6140 for the appropriate methods to use. They can also direct you to any other agencies that you may need to work with.

A Habitat Permit review is required for proposed clearing in riparian or priority habitat areas. Begin by calling Clark County Environmental Services at 564-397-5855.

On more projects involving multiple permits and agencies, completing a joint aquatic resource permit application (JARPA) can streamline the permitting process since several permitting agencies accept this single application form. The time frame for permits varies greatly depending on the work and the sensitivity of the area, but can take up to seven weeks for the process.

Can I cut down a tree or use a tree for firewood on my property?

Interested in providing habitat? Leave that snag! As long as the snag does not present a danger to buildings or people, they supply important nesting sites for birds. The decaying wood also returns organic matter to your woodland soil.

Removing trees for firewood for your own personal use does not usually require a permit. You can also remove a hazard tree without a permit if it is within one and a half tree lengths from an existing building. You will need to obtain a permit from Clark County Environmental Services the when:

  • Removing over 5,000 board feet (equivalent to a full load on a logging truck)
  • Removing timber commercially
  • Selling firewood.

Any activity in streams, wetlands, rivers, and on unstable slopes also requires a Habitat Permit from Clark County Environmental Services at 564-397-5855. Additional information Forest Practice Reviews.

A Forest Practices Permit may be required from Department of Natural Resources  (564-577-2375).

Can you explain the notice I received from Vegetation Management

The notice most likely tells you that your property harbors weeds considered noxious The notice includes color photos of the noxious weed(s) and instructions by the state. State law declares that landowners are responsible for controlling the spread of noxious weeds.

This notice includes color photos of the noxious weed(s) and instructions on what to do next. You will need to contact Vegetation Management and tell them what you intend to do to control the weed(s). Advice and recommendations for controlling weeds are available from Vegetation Management.

Vegetation Management staff follow-up within twelve days to see that you have taken steps to control the weed. If you have not taken measures to control the noxious weed, you will receive a violation notice by certified mail. You have ten days from receipt of the violation notice to stop seed propagation. Vegetation Management will work with landowners, to develop a land management plan to obtain meaningful control for the noxious weeds on your property. For those few who refuse to work to control their noxious weeds, failure to heed the violation notice can result in an infraction and Vegetation Management obtaining a warrant to enter your property and control the weeds at the landowner’s expense or issuance of a notice of civil infraction with fines ranging from $500 to $1,000 per weed species, per day.

A list of noxious weeds, mowers and certified sprayers can be obtained through Vegetation Management and is available on their website. Controlling weeds is important since weeds often compete with crops, poison people and livestock, and create fire hazards. Weeds also threaten wetlands, rivers, and lakes and other native plant communities. For information, contact Clark County Vegetation Management at 564-397-6140.

Can I outlet rainwater from the roof of my house, barn, or outbuilding directly to the ditch along the county road by my property?

You can divert this runoff to the ditch along the county road as long as it is just clean water. However, if the rainwater becomes contaminated or muddy, you cannot route it to the ditch. Contamination may come from animal manure, vehicle oils, chemicals (herbicides, pesticides), or other sources. Once these contaminants enter a ditch, they flow downhill until they enter into a creek. Contaminants can affect not only the health of aquatic life, but also that of humans when they recreate.

In general, infiltrating the rainwater on site presents the best solution. This recharges ground water, reduces erosion, and helps maintain a healthy watershed. For structures such as a house, one alternative would be a rain garden, a shallow depression planted with native flowers, shrubs or grasses that collects rainwater from gutters and allows it to soak back into the ground. Larger structures, such as barns, would need more than one rain garden. For more information on rain gardens visit WSU Extension Rain Gardens. raingarden.wsu.edu.

Constructing drywells or diverting rainwater to other vegetated areas offers other possible solutions.

Can I deepen or work in an existing ditch on private property that may have silted in over the years?

Every property is different and needs to be evaluated separately. If you want to deepen a ditch, the best advice is to contact Clark County’s Permit Center at 564-397-4078. It is necessary to be careful when digging to avoid stirring up sediments or contaminants that might be transported to streams or other waterbodies since these can damage aquatic life and sometimes degrade the stream habitat as well.

Many older ditches were dug years ago to drain wetlands. Work in these ditches may require a Wetland or Habitat permit from Clark County. Some projects might require a Hydraulic Project Approval (HPA) permit from Washington State Department of Fish and Wildlife (360-902-2534), especially if the ditch flows into a fish bearing stream. To avoid disturbance (sediment and other contamination) to nearby creeks, any grading should be done during the drier summer months.

You can visit the Permit Center at 1300 W. Franklin in Vancouver to speak with someone in person about your project. Doing this ensures that you are doing everything necessary before beginning any work.

I’ve heard that farmers don’t need to get any permits. Is that true?

No, but some agricultural activities are exempt from permit requirements. Generally, activities considered “normal farming practices” are exempt. For example, farmers can generally maintain and repair existing agricultural facilities such as agricultural buildings, animal waste management structures, roads (they may not change culvert sizes or the embankment), and ponds (they may not enlarge a pond).

Agricultural operations may clear vegetation, stumps and undergrowth 4 without a permit unless clearing is within 200 feet of a stream or wetland. This may require a habitat or wetland permit. These operations may also use soil amendments such as fertilizer, compost and animal waste. However, these should not be applied where they are likely to be washed into streams or other waterbodies due to the harmful effects this might have on the stream or its aquatic life.

When in doubt, an ad hoc committee from the USDA Natural Resource Conservation Service (360-883-1987), the Clark Conservation District, and WSU Extension make recommendations to Clark County on what constitutes normal farming practices.

Farming activities that require importation or excavation of fill material (exclusive of soil amendments) may not be exempt.
This might include constructing an agricultural building pad, new drainage ditches, ponds, roads, or bridges.

What kind of activities will trigger the need for a grading permit?

The total amount of material imported and/or excavated triggers grading permits, not the specific activity. On urban lots over one acre and rural lots under five acres moving 100 cubic yards or more of material, requires a grading permit. On rural lots over five acres, moving over 200 cubic yards requires a grading permit. In critical areas the threshold for permit requirements is 50 cubic yards (Clark County Code 14.07) Since this is not a large amount of material, most grading activities will need permits. (Consider that a 20’ x 20’ x 3 1/3’ deep hole produces 50 cubic yards.)

What is a “yard” or “cubic yard” of material? Calculate the length times the width times the depth of the area (measured in feet) to be excavated or moved, and divide the result (cubic feet) by 27. This provides the number of cubic yards of material. For example, a mound 30 feet long, 12 feet wide and 2 feet tall, equals 26.7 cubic yards.

Grader Beware! Grading and inspection fees double if you grade without a permit, even if you were unaware you needed a grading permit. For information, contact, Clark County Public Works, 564-397-6118

If I want to build a pond on my property, what do I need to know before I build one? What if I just like the sound of running water, can I build a water feature?

This is a complex question, so we have written a separate factsheet to help you out. Start by reading Constructing Ponds and Water Features: What Does it Take? (PDF) so you know what agencies you might need to talk to.

Can I raise trout? How about other fish species?

Stocking a pond with fish requires a permit from the Washington State Department of Fish and Wildlife (WDFW) to assure that stocked fish do not escape into streams and other water bodies. Stocked fish that escape can replace native fish species by competing for habitat and food, introducing diseases, and predation.

Fish suitable for Washington include rainbow trout, largemouth bass, bluegill, sunfish, and channel catfish. You can contact the WDFW for a list of certified disease-free fish growers.

Getting the permit. Along with a $24 fee and $70 processing fee, submit the permit application to the SW Regional WDFW office at 2108 Grand Boulevard in Vancouver (360) 906-8972). WDFW will arrange for a fish biologist to inspect your site’s water quality, source, inlet and outlet structures, and other parameters, in addition to your proposed source of fish. Stocking permits may take 30 days to process. If other permits are required, it could take longer.

Can I draw water from the small stream that flows on my property?

The short answer is no. Stream water belongs to the public and altering flows requires a “water right.” A water right grants individuals or groups the use of a certain amount of water, but not ownership. Legally, a water right “is a legal authorization to use a predefined quantity of public water for a designated, beneficial purpose.”

Water rights law involves a very complex set of rules throughout the 5
western U.S. For more information, contact the Washington State
Department of Ecology, Southwest Region 360-407-6300 or view their web site on water rights.

If I cannot use surface waters, what about using my well water?

Landowners do not need a water right to use well water if consumption is less than 5000 gallons per day when the water is used for single or group domestic purposes, stock watering, industrial purposes, or lawns and non-commercial gardens of a half acre or less. Amounts over 5,000 gallons require a water right.

Considering that an average household uses 300 gallons of water per day, a 5,000 gallon limit does not impact most landowners.

This information can be found on the Department of Ecology’s web site.

Can I collect rainwater to use on my property?

On October 12, 2009, the Department of Ecology issued an Interpretive Policy Statement clarifying that a water right is not required for rooftop rainwater harvesting. Once you have collected the rainwater there are no limitations on its use.

The rainwater storage system may also be used for rainwater collection to store groundwater withdrawn under the groundwater permit exemption for future beneficial use (i.e. an owner may pump groundwater in the winter under the permit exemption, store it, and then use it in the spring and summer). According to the new rainwater interpretive policy, an “onsite” rooftop/guzzler system means the storage and use of the rainwater occurs on the same parcel as the roof from which the water was captured.

For more information on rainwater collection visit the Department of Ecology’s website.

What is an easement and how does it affect the use of my property?

An easement allows another person or entity to use a part of your property for a specified purpose, even though you own the land. Your property title or deed should state any easements recorded on your property. If you cannot find this, your title company will usually provide a copy of the paperwork to you at little or no charge. The Clark County Department of Assessment and GIS (360-397-2391) can also provide a copy for a fee or you can visit Clark County Maps Online.  View the Instructions for using Maps Online.

Not all easements are created equal. The county road easements allow the county to build or expand a road without obtaining your approval. Power line easements usually allow utility company access and restrict the height of vegetation growing under the lines. It is not uncommon for “landlocked” properties to have easements on a property to allow access to a nearby road. In this latter case, you would not be able to build or otherwise limit vehicle access to the landlocked property.

Buying property? Make sure that you understand and are comfortable with any restrictions or easements placed on the use of your property before you sign. The bottom line is, if an easement shows on the title search, ask your realtor and be sure you understand what it means before you sign.

What general advice would be good when looking at doing projects on my acreage?

Always ask questions. Ask until you understand exactly what permits are required, from which agency, and in what sequence before starting on a project. While permits can get complicated and restrictive at times, remember that codes are in place to protect you, your property, your neighbors and their property, and the environment.

 

Small Acreage Program

 

 

~ Small Acreage Program Listserv ~
Receive emails about upcoming classes and events.

 

Contact Us

Terry Koper
WSU Small Acreage Coordinator – Clark County
1919 NE 78th St Vancouver, WA 98665-9752
564-397-5729
terry.koper@wsu.edu

Justin O’Dea
Regional Agricultural Specialist Faculty – WSU Clark County Extension
1919 NE 78th St Vancouver, WA 98665-9752
(564) 397-5701
justin.odea@wsu.edu

 

 


 

 

Agencies

Clark Conservation District
813 West Main Street, Suite 106
Battle Ground, WA 98604
360-859-4780
https://clarkcd.org/

Clark County Community Development
1300 Franklin Street, Floor 1
Vancouver, WA 98660
564-397-2375
https://clark.wa.gov/development/

Clark County Environmental Services
1300 Franklin Street
Vancouver, WA 98660
564–397-2121
https://clark.wa.gov/

Clark County Public Works
1300 Franklin Street
Vancouver, WA 98660
564-397-6118
http://clark.wa.gov/publicworks/

Clark County Vegetation Management
4700 NE 78th St, Building G
Vancouver, WA 98665
564-397-6140
https://clark.wa.gov/public-works/vegetation-management

Department of Ecology, Southwest Region
360-407-6300
Water Resources Program DOE
360-407-6872
http://www.ecy.wa.gov/

Washington State Department of Fish and Wildlife,
Region 5
5525 S 11th Street
Ridgefield, WA 98642
306-696-6211 FAX 360-906-6776
https://wdfw.wa.gov/places-to-go/weekender/southwest

Washington State Department of Labor and Industries
312 SE Stonemill Drive Suite 120
Vancouver, 98684-3508
360-896-2300
http://www.lni.wa.gov/

Washington State Department of Natural Resources
Headquarters 360-902-1000
Pacific Cascade Region 360-577-2025
http://www.dnr.wa.gov/

U.S. Army Corps of Engineers
Seattle District, Regulatory Branch
Post Office Box 3755
Seattle, WA 98124-3755
206-764-3495 FAX 206-764-6602
http://www.nws.usace.army.mil/

USDA Natural Resource Conservation Service
500 W. 12th Street
Vancouver, WA 98660
360-768-3045
http://www.wa.nrcs.usda.gov/

WSU Clark County Extension
1919 NE 78th Street
Vancouver, WA 98665
564-397-5729
https//extension.wsu.edu/clark/

 

 

Permits & Permitting Agencies – A Short Guide

 

Extension programs are available to all without discrimination. Report evidence of noncompliance to your local Extension office.


Our pages provide links to external sites for the convenience of users. WSU Extension does not manage these external sites, nor does Extension review, control, or take responsibility for the content of these sites. These external sites do not implicitly or explicitly represent official positions and policies of WSU Extension.